Skip to content
SalvitelleCorporate Hub

Preliminary document · Version 1.0

Masterplan

The physical structure of the Corporate Hub and the Campus.

Concept

A network, not a plot

The masterplan translates the Method into space. The existing village is already a network of buildings, squares, paths and landscape to connect — not land to replace.

Masterplan

The Main Plaza

Greenery, trees, water, shade, a bar and space for events. It has to work on an ordinary day too.

The Main Hub

It concentrates the shared functions. Offices stay spread across different buildings and flow in here: no single block, and the building stock recovers step by step.

  • Auditorium
  • Meeting rooms
  • Coworking
  • Reception
  • Restaurant
  • Bar
  • Lounge
  • Training
  • Gym

The elements

What the campus is made of

Housing

Apartments within walking distance of the campus: recovering what exists, affordable rents, new units only where needed.

Families

Homes close to childcare, school, sport and green space. Family logistics become a competitive advantage.

Mobility

Priority to walking, micromobility, peripheral parking and electric. Efficient links, without a campus ruled by cars.

Energy and water

Buildings assessed as one system: photovoltaics, storage, heat pumps, load management and rainwater recovery.

Spatial phases

The order of building

  • 01

    Pilot square

    First offices and first homes around the public space.

  • 02

    Community

    Food and services that make the place livable every day.

  • 03

    Main Hub

    The shared functions and the auditorium.

  • 04

    Expansion

    New offices and new housing, on verified demand.

  • 05

    Energy

    Integrated energy infrastructure at campus scale.

Every intervention must produce economic, social and environmental value together.

We are not rebuilding the past.

We are building a place where technology and history coexist, work sustains the community, and the territory generates opportunity again.

Talk to us