State of the work

Pipeline

What has been done, what is underway and what has yet to start. With the evidence, where it exists.

The sequence

Seven phases

The sequence is reconciled from four independent lists in the project documents: the Manifesto's four phases, the Masterplan's five spatial ones, the Metodo's seven steps and the business plan's Next Phase. The progress, by contrast, is ours to declare.

  1. Phase 01

    Done

    Analysis

    Mapping the building stock

    The first step produces nothing visible: it establishes what is there. Which buildings are genuinely candidates, what condition they are in, who owns them, what constraints apply, and what reaches them in terms of fibre, energy and mobility.

    It is the work that makes every other step possible. Without data on the real building stock, every number that follows — costs, capacity, return — is a well-written guess.

    Activities

    • DoneSurvey of the candidate buildings
    • DoneOwnership and planning constraints
    • DoneFibre, energy and mobility survey
    • DoneEstimating usable capacity

    Documents

    Survey of the candidate buildings

    • Measured elevation of a candidate buildingTo be determined

      Placeholder: replace with the real survey drawing.

  2. Phase 02

    Underway

    Pilot

    The square, the first offices, the first homes

    The pilot is the proof that the model holds outside the documents. Indicative target: 3–5 buildings, 5–10 companies, 30–100 workers — business plan figures, not results achieved.

    It starts with the square because that is the space holding everything else together: without somewhere for people to meet, an office in a village is just a more distant office.

    Activities

    • UnderwayRecovering the square
    • UnderwayFirst offices
    • To doFirst homes
    • To doContract model: municipality, operator, company

    Recovering the square

    • Comparison between the square today and the proposed recovery
      BeforeTo be determinedAfterTo be determined

      Placeholder. The before will be a photograph (VERIFIED), the after a render (TARGET).

  3. Phase 03

    To do

    Campus

    The functions that make the place liveable

    Auditorium, catering, coworking, family services and energy infrastructure. This is the phase where the place stops being merely workable and becomes liveable: the difference between going there and staying.

    Activities

    • To doCatering and everyday services
    • To doFamily services
    • To doCoworking and shared space
  4. Phase 04

    To do

    Ecosystem

    Resident startups and residency programmes

    Resident startups on multi-year contracts, mobile startups trying the place for weeks or months, and a partner network. This is the phase where the place stops being a container for offices and starts producing encounters.

    Activities

    • To doFirst resident startups
    • To doResidency programmes
    • To doPartner network
  5. Phase 05

    To do

    Main Hub

    The shared functions and the auditorium

    The physical centre the campus organises itself around: the functions no single company would build alone and every one of them uses.

    Activities

    • To doAuditorium
    • To doShared functions
  6. Phase 06

    To do

    Energy

    Campus-scale energy infrastructure

    It is not a roof with panels on it. It is a campus-scale system, and its sizing has to come from a study of real loads — which has not been done, and which no document replaces with an estimate.

    Activities

    • To doReal load study
    • To doPlant sizing
    • To doConsumption metering
  7. Phase 07

    To do

    Model

    Data, validation and replication

    The point where Salvitelle stops being a project and becomes a method: data gathered on the ground, economic validation of what was built, and replication in other municipalities with the same problem.

    Activities

    • To doField data collection
    • To doEconomic validation
    • To doReplication elsewhere

Status declared by the project · updated 2026-08-21

Two different readings sit side by side on this page. Progress is a statement by the project, not something drawn from the documents: none of them says how far the work has got, so we say who is claiming it and as of when. Provenance is a separate matter and concerns the images: a photograph of what exists is not the same claim as a render of what does not yet, and the badge always says which one you are looking at.

Progress

Done
Finished and documented.
Underway
Started, not yet finished.
To do
Not yet started.

Image provenance

Verified
Stated in the project documents.
Scenario
A hypothesis, valid only under the stated conditions.
Target
A declared objective, not an achieved result.

Can you move one of these phases forward?

Phases do not advance on their own. If you can contribute to one — with data, with expertise or with capital — it starts with an email to the Comune di Salvitelle.